Ione WTP Backwash Water Reuse Project

2 Documents in Project

Summary

SCH Number
2015018156
Public Agency
Amador Water Agency (AWA)
Document Title
Ione WTP Backwash Water Reuse Project
Document Type
NOE - Notice of Exemption
Received
Posted
1/21/2015
Document Description
This project will add facilities to recycle the filter backwash and return it to the headworks of the Ione Water Treatment Plant saving 16 million gallons of water annually. The facilities will be located within the existing water treatment plant site and will not increase the plant capacity.

Contact Information

Name
Gene Mancebo
Agency Name
Amador County Water Agency
Contact Types
Lead/Public Agency

Location

Cities
Ione
Counties
Amador

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15061(b)(3), 15301(b)
Reasons for Exemption
This project will return approximately 90% of the backwash water to the headworks of the plant reducing source water demands and discharges to the Ione wastewater system. There is no increase in plant capacity and all modifications are contained within the existing plant site. The project will constst of minor alterations to the water treatment plant.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print