Woodside School Multi-Use Pathway Project

Summary

SCH Number
2015018116
Public Agency
Town of Woodside
Document Title
Woodside School Multi-Use Pathway Project
Document Type
NOE - Notice of Exemption
Received
Posted
1/16/2015
Document Description
The scope of the project consists of installing new 250 LF of pathway on south side of SR 84 (Woodside Road) between project limits. The project will install pathway, concrete curb and drainage improvements. The proposed pathway will provide a safe route for the students to walk to school. The Woodside Road Project is being proposed specifically with the goals of both increasing bicycle and pedestrian safety along a well-traveled school route corridor.

Contact Information

Name
Dong Nguyen
Agency Name
City of Woodside
Contact Types
Lead/Public Agency

Location

Cities
Woodside
Counties
San Mateo

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15302(c)
Reasons for Exemption
The new pathway will be replacing the existing pathway to a school. Improve and provide safe access to the pedestrians. The replacement of the drainage facility involves negligible expansion of capacity.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print