Crystal Pier Maintenance and Repair Project

Summary

SCH Number
2015018096
Public Agency
Regional Water Quality Control Board, Region 9
Document Title
Crystal Pier Maintenance and Repair Project
Document Type
NOE - Notice of Exemption
Received
Posted
1/14/2015
Document Description
The project consists of substantial structural repair of piles that have deteriorated structurally and replacement of one missing pile. Repair of the pile will involve cutting and removing the existing pile to a point 6 inches beyond the extent of visible deteriation. The remaining pile stub will receive a threaded rod for pinning the new pile timer to the pile stub. A fiberglass jacket will be fitted around the pile connection jhoint and filled with hydro ester epoxy. Pile cap beams will receive new bracing and "T" straps. Off-site storage of the cottage may be required.

Contact Information

Name
Kerry Santoro
Agency Name
Regional Water Quality Control Board, Region 9
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301, 02, 31 - C1, 2, & 31
Reasons for Exemption
Maintenance of an existing facility involving negligible or no expansion of an existng use and maintenance dredging where the spoil is deposited in a spoil area authorized by all applicable state and federal regulatory agencies.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print