Mt. Murphy Road Bridge Project

3 Documents in Project

Summary

SCH Number
2015012056
Lead Agency
El Dorado County
Document Title
Mt. Murphy Road Bridge Project
Document Type
NOD - Notice of Determination
Received
Posted
5/19/2022
Document Description
The Project would construct a post tensioned cast-in-place (ClP) concrete box girder bridge built in two stages. The ClP concrete box girder bridge design provides a low maintenance structure that requires a minimal level of repair during its service life (i.e. biennial inspections, occasional joint replacement, and deck rehabilitation as needed). The total replacement bridge length is approximately 445 ft and is anticipated to be composed of two 130 ft end spans and one 185 ft main span.

Contact Information

Name
Jon Balzer
Agency Name
El Dorado County Department of Transportation
Job Title
Senior Civil Engineer
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Regions
Northern California
Cross Streets
Mt. Murphy Road at SR 49
Zip
95613
Total Acres
9.4
Parcel #
Multiple
State Highways
SR 49
Schools
Gold Trail Middle School
Waterways
South Fork of American River
Township
T11N
Range
10E
Section
17
Base
MTDM
Other Location Info
Coloma, Marshall Gold Discovery State Historic Park

Notice of Determination

Approving Agency
El Dorado County Department of Transportation
Approving Agency Role
Lead Agency
Approved On
County Clerk
El Dorado
Final Environmental Document Available at
2850 Fairlane Court, Placerville, CA 95667

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print