County of Nevada - Permit No. 642

3 Documents in Project

Summary

SCH Number
2015012005
Lead Agency
Nevada County
Document Title
County of Nevada - Permit No. 642
Document Type
NOD - Notice of Determination
Received

Document Description
U15-009 and EIS15-015. A Use Permit proposing the development of a full service County Corporation Yard with an approximately 28,000 sf Public Works and Transit building consisting of the following: 5,200 sf of administrative offices and employee corridors; 3,060 sf for a second-story multipurpose room that can be used for conferences, meetings, training and an alternative Emergency Operations Center; 16,480 sf dedicated to parts and service with 8 equipment service bays; and 3,200 sf of covered storage. The project will also result in several other improvements including: an approximately 2,000 sf and storage shed; a tire storage shed; a concrete de-mudding basin and truck/bus wash bins; two designated open equipment storage areas; a 1.98-acre portion of the site designated as "Open Materials Storage"; a 2.33-acre "County Storage Open Area"; a 2.71-acre "Future Development Area" (not considered a part of this project); a six ft tall chain link fence topped with razor wire; new paved and gravel roads for access and internal circulation; new utilities; onsite lighting; drainage facilities; landscaping; a septic system; and onsite parking (50 regular spaces, 5 ADA accessible spaces, 14 bus parking spaces and 73 emergency and special event overflow parking spaces).

Contact Information
Bill Solinsky
CA Dept. of Forestry and Fire Protection
P.O. Box 944246
Sacramento, CA 94246

916-263-3371

Location

Cities
Grass Valley
Counties
Nevada
Total Acres
39.26
Township
15N
Range
8E
Section
15
Base
MDB&M

Notice of Determination

Approving Agency
CA Dept. of Forestry and Fire Protection
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
1416 9th Street, 15th Floor, Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search