Santa Fe Avenue Bridge Replacement Project (California Endangered Species Act Incidental Take Permit No. 2081-2015-028-04 (ITP))

3 Documents in Project

Summary

SCH Number
2015011045
Lead Agency
Merced County
Document Title
Santa Fe Avenue Bridge Replacement Project (California Endangered Species Act Incidental Take Permit No. 2081-2015-028-04 (ITP))
Document Type
NOD - Notice of Determination
Received
Posted
8/19/2015
Present Land Use
GP: Agricultural Z: General Agricultural
Document Description
The Project consists of the demolition and replacement of the existing, structurally deficient two span timber stringer bridge (Bridge No. 30C0110) over Deadman Creek with a new bridge that will be wider, satisfy current design standards, and capable of carrying current legal vehicular loads. The Project will result in impacts to 1.31 acres of California tiger salamander upland aestivation habitat including temporary impacts to 1.21 acres; the project will permanently remove 0.10 acres of CTS upland aestivation habitat. The project is expected to result in incidental take of CTS, which is designated as a threatened species under the California Endangered Species Act. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of project implementation.

Contact Information

Name
Jim Vang
Agency Name
CDFW Central Region
Contact Types
Lead/Public Agency

Location

Counties
Merced
Cross Streets
South Santa Fe Avenue and South Ipsen Avenue
Zip
95333
Total Acres
2.46
Parcel #
068-120-032
Railways
ATSF
Schools
Le Grand Union ES, HS
Waterways
Deadman Creek, Dutchman Creek, Hadley Lateral
Township
8S
Range
16E
Section
28
Other Location Info
Le Grand

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print