Redland and Hemlock Booster Pumping Station Project

3 Documents in Project

Summary

SCH Number
2015011012
Lead Agency
Eastern Municipal Water District (EMWD)
Document Title
Redland and Hemlock Booster Pumping Station Project
Document Type
NOD - Notice of Determination
Received
Posted
4/7/2015
Present Land Use
Public Institutional Facilities
Document Description
Eastern Municipal Water District (District) proposes to construct and operate a new Booster Pumping Station (BPS) located on the southwest corner of Redlands Boulevard and Hemlock Avenue in the City of Moreno Valley. The new facility will replace the existing Redlands and Ironwood BPS located on the northwest corner of Redlands Boulevard and Ironwood Avenue, approximately 1,500 linear feet north of the new proposed BPS. The purpose of the Redlands and Hemlock Booster Pumping Station Project is to address safety concerns, deficient capacity, and inadequate access associated with the existing BPS. The Proposed Project will address deficiencies with the existing BPS pumping from the 1900 Pressure Zone (PZ) to the 2080 PZ by replacing the existing BPS and providing adequate discharge pipeline capacity in the 2080 PZ to convey water to the existing 2080 PZ transmission and distribution pipeline system. The Proposed Project includes the demolition of the existing facility and associated appurtenances; construction of a new facility and related appurtenances; and installation of approximately 1,500 linear feet of 24-inch diameter discharge pipeline within public right-of-ways.

Contact Information

Name
Helen Stratton
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency

Location

Cities
Moreno Valley
Counties
Riverside
Cross Streets
Redlands Blvd and Hemlock Avenue
Parcel #
488-310-013
State Highways
Hwy 60
Township
3S
Range
3W
Section
2
Base
SBB&M

Notice of Determination

Approving Agency
Eastern Municipal Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print