Village Parkway Extension Project

3 Documents in Project

Summary

SCH Number
2014122054
Lead Agency
West Sacramento, City of (City of West Sacramento)
Document Title
Village Parkway Extension Project
Document Type
NOD - Notice of Determination
Received

Document Description
The City of West Sacramento, in cooperation with the California Department of Transportation, is proposing a new 0.4-mile multi-modal roadway. The proposed project would extend Village Parkway from where it currently terminates at the intersection of Stonegate Drive to the Mike McGowan Bridge over the Yolo Barge Canal. The new roadway would be built to accommodate two 12-foot-wide lanes in each direction but would initially be striped for one. The build alternative would also include a 16 foot wide raised median, 6 foot wide bicycle lanes, 5 foot wide sidewalks set back from the curb by 5 foot wide landscaping strips, street lights, and underground utility infrastructure. The purpose of the project is to construct a new north-south roadway connecting the Mike McGowan Bridge to Village Parkway; relieve current and projected traffic congestion on nearby Jefferson Boulevard; improve road access for residents in the Southport neighborhood; and reduce cut-through traffic on Stonegate Drive and Gateway Drive.

Contact Information
Jay Davidson
City of West Sacramento
1110 W. Capitol Avenue, 2nd Floor
West Sacramento, CA 95691

(916) 617-4645

Location

Coordinates
36°33'22.3"N 121°31'16.9"W
Cities
West Sacramento
Counties
Yolo
Cross Streets
Stonegate Drive / Village Parkway Road
Zip
95670
Total Acres
17
Parcel #
046-010-011
State Highways
I-5, 50, SR 99
Railways
UPRR
Airports
Sacramento Executive
Schools
Stonegate ES
Waterways
American River, Deep Water Ship Channel
Township
8N
Range
4E
Base
MDB&M

Notice of Determination

Approving Agency
City of West Sacramento
Approved On
Final EIR Available Location
City of West Sacramento, 1110 West Capitol Avenue, 2nd Floor, West Sacramento, CA 95691

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search