SWID Recharge Project

2 Documents in Project

Summary

SCH Number
2014121087
Lead Agency
Shafter-Wasco Irrigation District
Document Title
SWID Recharge Project
Document Type
NOD - Notice of Determination
Received
Posted
2/12/2015
Document Description
The project includes construction and operation of approximately 65 20-acre groundwater recharge basins (and related facilities and appurtenances including water control structures), on approximately 1,300 acres within a 4,000-acre study area of the Shafter-Wasco Irrigation District ("District"), and includes potential use of existing recharge basins within neighboring districts. The intention of the project is to increase the District's ability to capture and store available water supplies in the groundwater aquifer, including existing District contract Friant supplies including recovered account and re-circulated water supplies, USBR Section 215 supplies, Kern River flood flows and other available flood flows in the Friant Kern Canal, and other water supplies that may become available to the District from the Calloway Canal or other conveyance facility or means. Implementation of the Project will help balance groundwater use and create a sustainable supply for the District and its landowners, and help avoid the adverse economic and environmental burdens associated with groundwater level declines.

Contact Information

Name
Dana Munn
Agency Name
Shafter-Wasco Irrigation District
Contact Types
Lead/Public Agency

Location

Cities
Shafter
Counties
Kern
Cross Streets
Hwy 43 / Kimberlina Rd / Hwy 99 / Lerdo Hwy
Total Acres
4000
State Highways
Hwy 43, 99
Airports
No
Schools
Sequoia ES
Waterways
Calloway Canal

Notice of Determination

Approving Agency
Shafter-Wasco Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes