Unit 2 Channel Improvements Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2014121082
- Lead Agency
- Santa Barbara County Flood Control District
- Document Title
- Unit 2 Channel Improvements Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 4/20/2015
- Present Land Use
- Flood Control Channel / AG-II-40
- Document Description
- The project includes the following: right-of-way acquisition for widening and access, smoothing a series of sharp horizontal channel curves, increases channel capacity, replacing and extending an emergency overflow weir, replacing adjacent drainage pipes, and increases flow capacity through the Santa Maria River Levee.
- Contact Information
-
Seth Shank
Santa Barbara County Flood Control District
130 E. Victoria St., Suite 200
Santa Barbara, CA 93101
Phone : (805) 568-3443
Location
- Coordinates
- 34°58'9"N 120°29'7"W
- Cities
- Santa Maria
- Counties
- Santa Barbara
- Cross Streets
- Black Rd. and West Main St.
- Zip
- 93458
- Total Acres
- 7.89
- Parcel #
- 117-020-058, 117-020-060, 117-160-
- State Highways
- Hwy 166
- Railways
- No
- Airports
- No
- Schools
- Bonita School
- Waterways
- Santa Maria River
- Township
- 10
- Range
- 34W
- Section
- 6
Notice of Determination
- Approving Agency
- Santa Barbara County Flood Control District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 123 E. Anapamu St., Santa Barbara, CA 93101
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.