Mission Trails Collection II
3 Documents in Project
Summary
SCH Number
2014121069
Lead Agency
City of Santee
Document Title
Mission Trails Collection II
Document Type
NOD - Notice of Determination
Received
Posted
2/1/2016
Present Land Use
Residential: Single Family Residence GP Designation: R-14 / Zoning: R-14
Document Description
The project would modify the Santee 50 project (Tentative Map [TM] 2014-1 and Development Review Permit [DR] 2014-5) approved on January 28, 2015 to include a new TM 2015-5 and DR 2015-9 to construct an additional 10 multi family townhomes on a 0.56 acre parcel adjacent to the approved project parcels. Combined with the approved Santee 50 project, a total of 60 multi family townhomes would be constructed.
The modifications to the approved project entail the addition of a 10 unit multi family residential townhome building on a 0.56 acre parcel that is surrounded on three sides by the approved project parcels, and would include a TM 2015-5 for the subdivision of the 10 units. The 10 unit townhome building, referred to as the Mission Trails Collection - 8758 Bushy Hill Drive Parcel (or additional parcel), would be incorporated into the approved project. Combined, the modifications and approved project would total 60 multi family dwelling units on 3.66 acres.
Contact Information
Name
Melanie Kush
Agency Name
City of Santee
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Santee
Counties
San Diego
Cross Streets
Bushy Hill Drive and Simeon Drive
Zip
92071
Total Acres
0.56
Parcel #
383-021-06-00
State Highways
SR 52, 125
Schools
Chet F. Harritt ES
Waterways
San Diego River, Santee Lakes
Notice of Determination
Approving Agency
City of Santee
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.