7th Street / Metro Portal Connection to The Bloc (KOP D)

2 Documents in Project

Summary

SCH Number
2014121051
Lead Agency
Los Angeles County
Document Title
7th Street / Metro Portal Connection to The Bloc (KOP D)
Document Type
NOD - Notice of Determination
Received
Posted
5/4/2015
Present Land Use
The proposed project would occur beneath and existing roadway and would be part of an existing transit system.
Document Description
The project involves constructing and underground pedestrian passageway below 7th Street to connect the existing 7th Street/Metro Center subway station to the under construction 1.8 million sf mixed use development called The Bloc (formerly Macy's Plaza). The station currently serves the Red, Purple, Expo, and Blue Lines. The original station was built with "knock-out panels" to facilitate station connections to designations near the station. The tunnel will be 17 lineal feet in length and 20 feet wide by 15 feet high. The tunnel will be approximately 27 feet below grade. The tunnel will join to the lower level of the future mall and provide street access via escalators.

Contact Information

Name
Emmanuel Liban
Agency Name
Los Angeles County Metropolitan Transportation Authority
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
7th Street / Flower Street
State Highways
Hwy 110
Railways
Metro Heavy & Light Rail
Waterways
Los Angeles River channel

Notice of Determination

Approving Agency
LA County MTA
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print