Lower Tule River Irrigation District Distribution System project

2 Documents in Project

Summary

SCH Number
2014121045
Lead Agency
Lower Tule River Irrigation District
Document Title
Lower Tule River Irrigation District Distribution System project
Document Type
NOD - Notice of Determination
Received
Posted
1/20/2015
Present Land Use
Agriculture
Document Description
The proposed project is the construction of new pipelines and replacement of an existing pipeline to better serve water users within the Lower Tule River Irrigation District (LTRID) service area. From east to west, the project extends approximately 12.6 miles and consists of 3 different laterals to connect to each other at all junctions. The pipeline will be buried and sections of the pipeline will stay outside of the right-of-way (ROW) of the roads. Project impacts will be temporary and constrained to a swath 20 to 30 feet wide for the entire length of the alignment. The approximate area of proposed temporary impact is 46 acres.

Contact Information

Name
Dan Vink
Agency Name
Lower Tule River Irrigation District
Contact Types
Lead/Public Agency

Location

Cities
Tulare
Counties
Tulare
Cross Streets
North of Ave 172, south of Ave 188, east of SR 99, and west of Road 180
Total Acres
11.3
State Highways
Hwy 99
Airports
Tulare Airstrip
Waterways
Tule River, north canal
Township
21S
Range
25E
Section
5
Base
MDB&M
Other Location Info
Tipton

Notice of Determination

Approving Agency
Lower Tule River Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print