Construction and Operation of Water Treatment Plant and Bicycle Lake Water Main Extension

4 Documents in Project

Summary

SCH Number
2014121024
Lead Agency
Regional Water Quality Control Board, Region 6 (Lahontan), Victorville
Document Title
Construction and Operation of Water Treatment Plant and Bicycle Lake Water Main Extension
Document Type
OTH - Other Document
Received
Present Land Use
Industrial
Document Description
The State Water Resources Control Board (SWRCB), as the responsible agency, will be issuing a water supply permit. The Regional Water Quality Control Board proposed project included the construction and operation of a new water treatment plant and extension to the existing Bicycle Lake water main to the water treatment plant. The water system improvements include pipelines connecting the water plant to Bicycle Lake booster station, replacement of expired pipe and equipment, and water supply/distribution system expansion. Other system improvements include improvements of fire flow, installation of a new water well at Langford Lake and connecting Irwin basin well(s) to Longford Lake transmission line. Tank construction includes rehabilitation of existing water storage tanks and repair/replacement of a structurally failing 1 million gallons or 3,785 cubic meters water storage tank. Project includes a connection to Energy Monitoring and Control System. The connection of Irwin wells to the Langford transmission line includes the rehabilitation of well I-9 and placing a building on the site with tank and booster pumps. Well I-2A will be configured to provide supplemental water to the reclaimed water system. The design capacity of the proposed water treatment plant is 6 million gallons per day with the capability of expanding to 12 million gallons per day in the future as needed.

Contact Information

Name
Sean McCarthy
Agency Name
SWRCB San Bernardino District Office
Contact Types
Lead/Public Agency

Location

Counties
San Bernardino
Cross Streets
Barstow Road and Outer Loop Road
Zip
92310
Total Acres
45
Parcel #
051914104 and 054401113
Airports
Bicycle Lake Army Airfield
Schools
Lewis ES
Township
14N
Range
3E
Section
31
Base
SBB&M
Other Location Info
Fort Irwin

Notice of Completion

Development Types
Water Facilities (Type Drinking Water, MGD 6)
Project Issues
Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Solid Waste, Transportation, Vegetation, Wetland/Riparian

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print