Construction and Operation of Fort Irwin Water Treatment Plant/Bicycle Lake Water Main Extension

4 Documents in Project

Summary

SCH Number
2014121024
Lead Agency
Regional Water Quality Control Board, Region 6 (Lahontan), Victorville
Document Title
Construction and Operation of Fort Irwin Water Treatment Plant/Bicycle Lake Water Main Extension
Document Type
NOD - Notice of Determination
Received
Posted
3/19/2015
Present Land Use
Industrial
Document Description
The Proposed Project would entail the construction of a new Water Treatment Plant (WTP) and water main extension. The new WTP would receive source water through an extension of the existing Bicycle Lake water main that conveys water from the Bicycle Lake Basin well field. The WTP's main treatment process would be electrodialysis reversal (EDR), followed by three waste stream treatment processes including partial lime softening, RO, and mechanical evaporation. These processes increase the recovery rate from 92 percent with EDR only to 99.8 percent and require an evaporation pond area of 6 acres.

Contact Information

Name
William Muir
Agency Name
RWQCB-Lahontan
Contact Types
Lead/Public Agency

Location

Counties
San Bernardino
Cross Streets
Barstow Road and Outer Loop Road
Zip
92310
Total Acres
45
Parcel #
051914104 and 054401113
Airports
Bicycle Lake Army Airfield
Schools
Lewis ES
Township
14N
Range
3E
Section
31
Base
SBB&M
Other Location Info
Fort Irwin

Notice of Determination

Approving Agency
RWQCB, Lahontan Region
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.