Yingling Conditional Use Permit; DRC2013-00115

2 Documents in Project

Summary

SCH Number
2014121009
Lead Agency
San Luis Obispo County
Document Title
Yingling Conditional Use Permit; DRC2013-00115
Document Type
NOD - Notice of Determination
Received
Posted
2/23/2015
Present Land Use
Residential Rural
Document Description
Request by Richard C. Yingling for a Conditional Use Permit to allow for the construction and operation of an unmanned wireless communications facility consisting of: a) three (3) new antenna sectors with three (3) directional antennas per sector mounted at a height of 45 feet above ground level attached to a 50-foot tall monopine with branches extending to 55 feet; b) one 11'-6" x 16'-10.5" prefabricated cellular equipment shelter; c) one 132-gallon diesel generator on 6' x 13 concrete slab; d) a new 6' tall chain link fence with 12 access gate at the lease area perimeter; e) landscape screening at the lease area perimeter to screen the chain link fence; and f) associated utility trenching for the installation of power and telco lines. The project is located on an approximately 7.42 acre parcel and will result in the disturbance of approximately 2,500 square feet (50'-0" x 50'-0" lease area and concrete pad) for the proposed facility. The facility will be accessed via a twelve foot wide gravel road, which will be widened and repaired to meet Cal Fire specifications. The proposed project is within the residential rural land use category, and is located at 6269 Hog Canyon Road, approximately 2.45 miles north of the community of Paso Robles, in the El Pomar-Estrella sub area of the North County planning area.

Contact Information

Name
Megan Martin
Agency Name
San Luis Obispo County
Contact Types
Lead/Public Agency

Location

Cities
Paso Robles
Counties
San Luis Obispo
Cross Streets
6269 Hog Canyon Road, San Miguel, CA
Zip
93451
Total Acres
7.42
Parcel #
019-321-022
Schools
Pleasant Valley Joint Union ESD
Waterways
Estrella River

Notice of Determination

Approving Agency
San Luis Obispo County Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print