Streambed Alteration Agreement No. 1600-2013-0283-R2 "Totally" THP.
Summary
SCH Number
2014119001
Lead Agency
California Department of Forestry and Fire Protection
(CAL FIRE)
Document Title
Streambed Alteration Agreement No. 1600-2013-0283-R2 "Totally" THP.
Document Type
NOD - Notice of Determination
Received
Posted
11/5/2014
Document Description
The project is limited to the removal of one CMP, followed by construction of one permanent CMP; Implementation of two temporary skid trail crossings, with alternative options to construct a temporary Spittler crossing or modify and re-construct the channel; Construction of three off-channel waterholes and one in-channel waterhole. Further information can be found in the THP 4-13-025-ELD.
Contact Information
Name
Caroline Petersen
Agency Name
CDFW North Central Region
Contact Types
Lead/Public Agency
Phone
Location
Counties
El Dorado
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.