Delta Flood Emergency Facilities Improvement Project Refinements
7 Documents in Project
Summary
SCH Number
2014112056
Lead Agency
California Department of Water Resources
(DWR)
Document Title
Delta Flood Emergency Facilities Improvement Project Refinements
Document Type
NOD - Notice of Determination
Received
Posted
2/12/2015
Present Land Use
Stockton Site-Industrial / Industrial General / Commercial; Rio Vista Site-Urban, Water-Dependent Industrial / Urban Industrial
Document Description
Minor refinements to the proposed project have been made since June 2013 and are the focus of this subsequent Initial Study/subsequent proposed MND (IS/MND). Proposed project refinements at the Stockton West Weber site include site clearing, grubbing, and removal of organic material including at least 14 and potentially up to approximately 20 trees during project construction; grading including importing backfill material; constructing 12-inch aggregate base all-weather surfaces above the 100-year flood elevation; improving, extending, or abandoning existing utilities services where required; constructing a new 7,000 square foot steel frame building with concrete foundation for warehouse use; constructing new concrete foundations for two rock conveyors; constructing a 6,500 square foot asphalt foundation/pad for four temporary office trailers and a pre-fabricated restroom facility; construct 4,600 square-foot asphalt of up to 150,000 tons of various rock gradations (an increase from 40,000 tons in original project description); installing an additional two spud piles (for a total of eight spud piles) near the toe of bank along the Stockton Deep Water Ship Channel to support two conveyor support barge structures; and installing up to 11 dolphin pile clusters for mooring of up to three transport barges during rock-loading operations.
Proposed project refinements at the Rio Vista site include: site clearing, grubbing, and removal of organic material including approximately 4.0 acres of trees as necessary during project construction; decreasing the acreage for vehicle parking from 1.25 acres to 0.75 acre; providing new water and electrical connections; and widening the existing access road from about 20 feet to 28 feet, including removing at least two and up to approximately 15 trees along the existing access road.
Contact Information
Name
Kristin Richmond
Agency Name
California Department of Water Resources
Contact Types
Lead/Public Agency
Phone
Location
Cities
Rio Vista, Stockton
Counties
Sacramento, San Joaquin, Solano
Cross Streets
Stockton: West Weber Ave & I-5 / Rio Vista: Airport Road & River Road (Hwy 84)
Parcel #
multiple
State Highways
Hwy 4, 12, 113, 160
Airports
Rio Vista Municipal
Waterways
San Joaquin and Sacramento Rivers
Notice of Determination
Approving Agency
DWR
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.