Pinole Creek Fish Passage Fish Restoration Enhancement Project (Lake or Streambed Alteration Agreement No. 1600-2014-0415-R3)

3 Documents in Project

Summary

SCH Number
2014112025
Lead Agency
Contra Costa Resource Conservation District (CCRCD)
Document Title
Pinole Creek Fish Passage Fish Restoration Enhancement Project (Lake or Streambed Alteration Agreement No. 1600-2014-0415-R3)
Document Type
NOD - Notice of Determination
Received
Posted
3/30/2015
Present Land Use
Creek
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2014-0415-RX, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Contra Costa Resource Conservation District. The Project is limited to the construction of a 184 linear foot fish-way notch through a previously existing 36 linear foot inlet apron within the upper 148 linear feet of an existing western, culvert bay. The fish-way notch will form and install approximately 13 angled concrete baffles. A 34 linear foot concrete training wall will be installed on the upstream apron and a 30 linear foot retaining wall will be installed on the downstream apron. A notched sill will also be installed on the downstream end of the culvert outlet to allow raised pooled water levels.

Contact Information

Name
Robert Stanley
Agency Name
CDFW Bay Delta Region
Contact Types
Lead/Public Agency

Location

Cities
Pinole
Counties
Contra Costa
Cross Streets
I-80 and Pinole Valley Road
Zip
94564
Total Acres
.5
Parcel #
Public Right-of-Way
State Highways
I-80
Railways
Capital Corridor
Airports
No
Schools
Pinole ES
Waterways
Pinole Creek

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print