LA County Dept. Public Works District 29 Priority Capital Deficiencies Improvements

4 Documents in Project

Summary

SCH Number
2014111057
Lead Agency
Los Angeles County Department of Public Works (DPW)
Document Title
LA County Dept. Public Works District 29 Priority Capital Deficiencies Improvements
Document Type
NOD - Notice of Determination
Received
Posted
5/5/2021
Document Description
The County of Los Angeles Department of Public Works (LACDPW) prepared a Water System Master Plan for the Los Angeles County Waterworks District 29. The WSMP describes the water infrastructure needs of District 29 through the year 2035. The WSMP identifies system facilities needed to overcome existing deficiencies and to meet anticipated system requirements through the target planning year. The Draft EIR provides programmatic-level environmental review for WSMP projects through 2035, and project-level environmental review for construction and operation of the WSMP Phase 1 projects: 6 above ground water reservoirs to be constructed at existing reservoir sites and 26 pipeline segments including an emergency connection pipeline to the Las Virgenes Municipal Water District at Encinal Canyon Road (pipelines totaling approx. 16 miles). the pipeline segments will be constructed underground in existing roadways - four in the Topanga area and the balance in Malibu.

Contact Information

Name
Eduardo Maguino
Agency Name
Civil Engineer
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles
Other Location Info
multiple locations in Malibu and unincorporated Los Angeles County

Notice of Determination

Approving Agency
Los Angeles County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://pw.lacounty.gov/wwd/web/SystemImrovements/DistrictNo29.aspx.

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print