Yellow Creek Bridge Replacement Project

4 Documents in Project

Summary

SCH Number
2014102077
Lead Agency
California Department of Transportation, District 2
Document Title
Yellow Creek Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2015
Present Land Use
PG&E facility and Caltrans right-of-way
Document Description
The California Department of Transportation (Caltrans) proposes to remove the existing Yellow Creek Bridge (Bridge No. 09-0008) on SR 70 and consruct a new, single-span bridge on the same alignment as the existing bridge. The project will include bridge replacement, retaining walls, rock sloppe protection, metal beam guardrail, culvert work, grading, snow plow reflectors, bridge barriers, vegetation removal and tree clearing, earthwork, drainage improvements, utility relocation, paving, sign replacement, and striping. The project will require temporary stream diversion and right-of-way acquisition.

Contact Information

Name
Chris Quiney
Agency Name
California Department of Transportation, District 2
Contact Types
Lead/Public Agency

Location

Counties
Plumas
Cross Streets
SR 70 and Belden Bridge
Zip
95915
Total Acres
13
Parcel #
PG&E property and Caltrans ROW
State Highways
Hwy 70
Railways
UPRR
Waterways
Feather River, Yellow Creek, Indian Creek, Chips Creek
Township
25N
Range
6/7E
Section
24/19
Other Location Info
Belden

Notice of Determination

Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print