State Route 99 Bridge Rail Upgrade, Seismic Retrofit, Widening, and Scour Repair Project

2 Documents in Project

Summary

SCH Number
2014102072
Lead Agency
Caltrans 3 (Marysville) (California Department of Transportation, District 3)
Document Title
State Route 99 Bridge Rail Upgrade, Seismic Retrofit, Widening, and Scour Repair Project
Document Type
NOD - Notice of Determination
Received
Posted
3/16/2015
Present Land Use
State Highway

Document Description
The California Department of Transportation (Caltrans) proposes to install seismic retrofit catcher/restrainer systems at the expansion joints of the following four bridges: Cosumnes River (24-0020R/L) and Cosumnes River Overflow Bridges (24-0021R/L). On Dillard Road Overcrossing (24-0163) non-standard bridge railings will be replaced on both sides of the bridge, remove asphalt concrete (AC) surfacing, sidewalk/curb, and place polyester concrete deck overlay.

Contact Information
Susan D. Bauer
California Department of Transportation, District 3
703 B Street
Marysville, CA 95901

Phone : (530) 741-7113

Location

Coordinates
38°21'6.78"N 121°20'24.93"W
Cities
Elk Grove
Counties
Sacramento
Cross Streets
Dillard Road
Zip
95624
Total Acres
4
Parcel #
State Highway
State Highways
Hwy 99
Railways
UPRR
Waterways
Cosumnes River

Notice of Determination

Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
http://www.dot.ca.gov/dist3/departments/envinternet/envdoc.htm

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print