Mormon Island and Lakeridge Oaks Lift Station Removal Project

3 Documents in Project

Summary

SCH Number
2014102042
Lead Agency
El Dorado Irrigation District
Document Title
Mormon Island and Lakeridge Oaks Lift Station Removal Project
Document Type
NOD - Notice of Determination
Received
Posted
2/9/2015
Present Land Use
Private property and land within El Dorado Irrigation District public utility easements
Document Description
The El Dorado Irrigation District (District) is proposing to remove the Mormon Island and Lakeridge Oaks lift stations, since these facilities have reached the end of their design life and need complete replacements to continue reliable service. The District has determined the best course of action is to bypass the two lift stations and send all sewer flows via gravity to the nearby Promontory 3 Lift Station. The District would then remove the two out-of-service lift stations thereby reducing the cost of rehabilitating the lift stations, reducing the potential for sewer system overflows, and reducing the overall operations and maintenance costs associated with these lift stations.

Contact Information

Name
Kristin Schaeffer
Agency Name
El Dorado Irrigation District
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
Green Valley Road and Amy's Lane
Zip
95726
Total Acres
1.2
Parcel #
124-301-40
Waterways
Lower American River
Township
10N
Range
8E
Section
21
Base
MDB&M
Other Location Info
El Dorado Hills

Notice of Determination

Approving Agency
El Dorado Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print