McKean Road Tank and Pipeline Project

3 Documents in Project

Summary

SCH Number
2014102023
Lead Agency
San Jose, City of (City of San Jose)
Document Title
McKean Road Tank and Pipeline Project
Document Type
NOD - Notice of Determination
Received

Document Description
The project is part of a larger project which includes installing 3300 feet of water pipeline and a storage tank to improve operational storage in service area for San Jose Water Company. The project covered under the Lake and Streambed Alteration Agreement No. 1600-2015-0176-R3 CDFW is executing pursuant to Section 1602 of the Fish and Game Code, is limited to the construction of a 150-foot long by 4-foot wide prefabricated bridge across Alamitos Creek, tributary to Guadalupe River, just east of Almaden Road, City of San Jose, and a 50-foot long by 10--foot wide pipe/vehicle bridge across the Almaden-Calero Canal. Concrete abutments for the Alamitos Creek bridge will be installed on each side of the creek outside of the floodplain and riparian wetlands adjacent to the creek. The bridge will be built off site and installed using a crane once the abutments are in place. The pipeline will be installed via open-cut trenching within existing swales. The open-cut method will require a workable trench of 3 to 5 feet wide and excavation to a depth of 6 to 15 feet. The disturbed area along the pipeline alignment will be restored to pre-disturbance conditions by backfilling the trench, leveling to match the surrounding grade, and seeding with an appropriate native grass mixture.

Contact Information
Suzanne DeLeon
CDFW
7329 Silverado Trail
Napa, CA 94558

831-440-9433

Location

Cities
San Jose
Counties
Santa Clara
Cross Streets
Between Almaden Road and McKean Road
Total Acres
6.7
Parcel #
724-09-048, 49, 13, 47, 50, 24, 15
Waterways
Alamitos Creek, Almaden-Calero canal
Township
8S
Range
1E
Base
MDB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
7329 Silverado Trial, Napa, CA 94558

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
N/A