North Haiwee Dam No.2 Project (Highway US 395 Turn-lane)

6 Documents in Project

Summary

SCH Number
2014101065
Lead Agency
Los Angeles Department of Water and Power
Document Title
North Haiwee Dam No.2 Project (Highway US 395 Turn-lane)
Document Type
NOD - Notice of Determination
Received
Posted
6/12/2019
Project Applicant
Caltrans

Document Description
A Caltrans highway encroachment permit will be issued for the installation of a southbound turn-lane on highway US 395 at Cactus Flat Rd and the realignment of the Cactus Flat Rd intersection. This permit only applies to work within Caltrans right of-way. Caltrans comments on LADWP's Draft EIR/EA resulted in LADWP's incorporation of the above work as part of the North Haiwee Dam No.2 Project. These measures are mitigation for increased/prolonged truck traffic, on highway US 395, related to dam construction. An Addendum to the EIR/EA (May 2019) includes avoidance/mitigation measures to be followed for the above described work. Caltrans concurs with these measures.

Contact Information
Forest Becket
Caltrans District 9
500 South Main St.
Bishop, CA 93514

Phone : (760) 872-0681

Location

Counties
Inyo
Cross Streets
In Inyo County on Highway US 395 at Cactus Flat Road.

Notice of Determination

Approving Agency
California Department of Transportation (Caltrans)
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Los Angeles Department of Water & Power ,Environmental Affairs, 111 N. Hope St., Los Angeles CA, 90012

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2014101065_NOD Hwy Permit for N_Haiwee Dam No_2 Project   PDF 3261 K
Download CSV New Search