North Haiwee Dam No. 2 Project
6 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2014101065
- Lead Agency
- City of Los Angeles
- Document Title
- North Haiwee Dam No. 2 Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/27/2018
- Present Land Use
- Multiple land uses: natural resources, local and federal lands - undeveloped LADWP-owned and BLM-Managed lands)
- Document Description
- The Project is to improve the seismic reliability of the North Haiwee Reservoir through construction of a new dam, North Haiwee Dam No. 2 (NHD2), in order to maintain the function of an essential water conveyance infrastructure for the City of LA, as well as to protect local populations from a hazardous flooding event. The Project consists of the following 4 components: 1) Construction of the NHD2; 2) Realignment of Cactus Flats Road; 3) Realignment of the LA Aqueduct, which includes excavation of various materials and construction of the diversion structure and temporary bridge; and 4) Construction of the diversion channel and North Haiwee Dam modifications.
- Contact Information
-
Brian Gonzales
City of Los Angeles
Lead/Public Agency
Environmental Affairs 111 North Hope Street, Rm 1044
Los Angeles, CA 90012
Phone : (213) 367-2612
Location
- Counties
- Inyo
- State Highways
- 395
- Waterways
- Los Angeles Aqueduct, North Haiwee Reservoir, various
- Other Location Info
- Olancha, Haiwee, Lone Pine, Keeler
Notice of Determination
- Approving Agency
- LA Dept. of Water and Power
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 111 N. Hope St., Room 1044, LA, CA 90012
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.