Santa Anita Dam Spillway Modification Project (Lake or Streambed Alteration Agreement No. 1600-2015-0155-R5)

6 Documents in Project

Summary

SCH Number
2014101044
Lead Agency
Los Angeles County Flood Control District
Document Title
Santa Anita Dam Spillway Modification Project (Lake or Streambed Alteration Agreement No. 1600-2015-0155-R5)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2015-0155-R5, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Los Angeles County Flood Control District. The project is limited to maintaining existing flood control and water conservation operations at Santa Anita Dam (Dam), and conducting retrofit of the Dam to create the capacity to pass the Probable Maximum Flood (PMF) of 26,100 cubic feet per second. The purpose and need for the project is to reduce the risk of Dam failure from uncontrolled overtopping during major rain events. Reducing the risk of Dam failure is proposed by modification of Dam's existing spillway with sufficient capacity to pass the PMF.

Contact Information
Matthew Chirdon
CDFW
3883 Ruffin Rd.
San Diego, CA 92123

805-640-1165

Location

Coordinates
34°10'16.03"N 118°1'21.96"W
Cities
Monrovia Arcadia
Counties
Los Angeles
Cross Streets
Elkins Ave. and Lower Clamshell Truck Route
Zip
91006
Total Acres
23
Parcel #
5765-001-900
State Highways
I-210
Railways
No
Airports
No
Schools
Highland Oaks ES
Waterways
Santa Anita Canyon Wash
Township
1N
Range
11W
Section
15

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
3883 Ruffin Rd., San Diego, CA 92123

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search