San Jose Creek Bike Path Project (Lake or StreambedAlteration Agreement No. 1600-2016-0181-R5)

2 Documents in Project

Summary

SCH Number
2014101021
Lead Agency
Santa Barbara County
Document Title
San Jose Creek Bike Path Project (Lake or StreambedAlteration Agreement No. 1600-2016-0181-R5)
Document Type
NOD - Notice of Determination
Received
Posted
3/16/2017
Present Land Use
Z: REC: County open space, PU: electrical substation, DR-4.6 (design residential): adjacent residential area.
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0181-R5, pursuant to section 1602 of the Fish and Game Code to the project applicant, Santa Barbara County Public Works Department represented by Morgan Jones. Project, as proposed, consists of a 970 foot long Class 1 bike path between Kellogg Ave. and Merida Drive including installation of a free-span bridge over San Jose Creek. The bike path will be ten feet wide and include one-foot shoulders on each side. The bike path will be paved with asphalt concrete over an aggregate base. The crossing over San Jose Creek will be constructed of pre-fabricated steel, approx. 140 feet long and 12 feet wide with a wood surface decking over steel. Concrete abutments to support the bridge will be driven or drilled piles involving excavation and pour of wet cement inside of the streambed but still within the riparian habitat zone of the streambed. Project will involve earthwork consisting of approx. 70 cubic yards of cut and 720 cubic yards of fill with 650 cubic yards of clean fill imported. Equipment used to complete the project will include heavy-duty trucks, a backhoe, drill rig, excavator, and a cement truck.

Contact Information

Name
Sarah Rains
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Goleta
Counties
Santa Barbara
Cross Streets
Cathedral Oaks Road/Kellogg Avenue
Zip
93111
Total Acres
1.5
Parcel #
069-350-031, 069-100-004, -006
State Highways
US 101, 192, 217
Railways
UPRR
Airports
Santa Barbara
Waterways
San Jose, San Pedro, Maria Ygnacio, S. Antonio creeks
Township
4N
Range
28W
Base
SBB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.