Western Rosedale In-Lieu Service Area Project and Westside Recharge Ponds Expansion

2 Documents in Project

Summary

SCH Number
2014101016
Lead Agency
Rosedale-Rio Bravo Water Storage District
Document Title
Western Rosedale In-Lieu Service Area Project and Westside Recharge Ponds Expansion
Document Type
NOD - Notice of Determination
Received
Posted
11/17/2014
Present Land Use
The Project sites are currently used for agricultural purposes, adn they are zoned for agriculture
Document Description
The Project includes construction and operation of approximately ten miles of water conveyance, pipelines and appurtenant facilities (including pumps, valves, flow meters, air vents, and connections to existing facilities) and construction and operation of two groundwater recharge ponds (totaling approximately 55 acres and located directly adjacent to the District's existing Westside Recharge Ponds). Operation of the Project includes provision of water through proposed facilities and groundwater recharge via percolation into an existing sump. Operation of the Project facilities will increase the District's ability to recharge water by up-to 15,000 acre-feet per year (including 10,000 acre-feet through in-lieu recharge) in addition to the amount covered by the District's Master Final EIR for the Groundwater Storage, Banking, Exchange, Extraction & Conjunctive Use Project and addenda thereto ("Master FEIR"). Project facilities will be operated consistent with the Master FEIR.

Contact Information

Name
Dan Bartel
Agency Name
Rosedale-Rio Bravo Water Storage District
Contact Types
Lead/Public Agency

Location

Counties
Kern
Cross Streets
Hwy 58, I-5, Cannon Street
Zip
93206
Total Acres
4800
State Highways
Hwy 58, I-5
Railways
UPRR
Airports
Elk Hills-Buttonwillow Airport
Schools
Buttonwillow Union School
Waterways
East Side Canal, Depot Ditch, Goose Lake Slough
Other Location Info
Rosedale

Notice of Determination

Approving Agency
Rosedale Rio-Brave Water Storage District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print