Park Avenue Bridge Replacement Project

2 Documents in Project

Summary

SCH Number
2014101015
Lead Agency
Newport Beach, City of (City of Newport Beach)
Document Title
Park Avenue Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
12/2/2014
Present Land Use
The project site is occupied by the existing Park Avenue Bridge structure. As a roadway facility, the project site does not have land use or zoning designations under the City's General Plan and Zoning Code

Document Description
The proposed project would consist of the demolition of the existing Park Avenue Bridge, and construction of an improved seismically-reinforced bridge over the Grand Canal. The new bridge would include 11-foot vehicle lanes, 6-foot raised sidewalks, and ADA-compliant switchback ramps. To maintain access to Balboa Island and Little Balboa Island during construction activities, the project would consist of the installation of a temporary bridge over the Grand Canal at Balboa Avenue, which would allow for demolition of the entire Park Avenue Bridge at one time and reconstruction in a single phase.

Contact Information
Fong Tse
City of Newport Beach
100 Civic Center Drive
Newport Beach, CA 92660

Phone : (949) 644-3321

Location

Coordinates
33°36'20.52"N 117°53'20.16"W
Cities
Newport Beach
Counties
Orange
Cross Streets
Park Avenue and Grand Canal
Zip
92660
Total Acres
.25
State Highways
SR-1
Airports
John Wayne
Schools
Various
Waterways
Newport Bay, Pacific Ocean
Township
6S
Range
10W
Section
35
Base
SBB&M

Notice of Determination

Approving Agency
City of Newport Beach
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
City of Newport Beach, Public Works Department, 100 Civic Center Drive, Newport Beach, CA 92660

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.