National Beef Brawley Wastewater Pre-Treatment Closure Project

2 Documents in Project

Summary

SCH Number
2014101007
Lead Agency
Regional Water Quality Control Board, Region 7 (Colorado River Basin), Palm Desert
Document Title
National Beef Brawley Wastewater Pre-Treatment Closure Project
Document Type
NOD - Notice of Determination
Received
Posted
11/18/2014
Present Land Use
Industrial / M-2 heavy Manufacturing zone

Document Description
The proposed project is for the closure of the wastewater pre-treatment facility (WWPT) at the National Beef California, LP beef processing plant in Brawley, CA. In May 2014, National Beef ceased all beef processing at its Brawley facility. The WWTP system has and will continue to operate at decreasing levels during the approximately four-year Closure Project until it is complete. The Project does not include any new construction or the installation of any new process or control equipment.

Contact Information
Doug Wylie
Colorado River Basin Regional Board
73-720 Fred Waring Drive, Suite 100
Palm Desert, CA 92260

Phone : (760) 776-8960

Location

Cities
Brawley
Counties
Imperial
Cross Streets
East Shank Road and State Hwy 111
Zip
92227
Total Acres
87
Parcel #
047-010-029
State Highways
Hwy 111
Railways
SPRR
Airports
Brawley Municipal
Waterways
Imperial Valley Drains
Township
13S
Range
14E
Section
28
Base
SBB&M

Notice of Determination

Approving Agency
Colorado River Basin Regional Water Quality Control Board
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Colorado River Basin Regional Board, 73-720 Fred Waring Drive, Suite 100 Palm Desert, CA 92260

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search