Ackley Road at Manning Creek Bridge Replacement Project (Streambed Alteration Agreement No. 1600-2014-0226-R2).

2 Documents in Project

Summary

SCH Number
2014092073
Lead Agency
Lake County
Document Title
Ackley Road at Manning Creek Bridge Replacement Project (Streambed Alteration Agreement No. 1600-2014-0226-R2).
Document Type
NOD - Notice of Determination
Received

Document Description
The CA DFW has executed Lake and Streambed Alteration Agreement number 1600-2014-0226-R2, pursuant to Section 1602 of the Fish and Game Code to the project Applicant, County of Lake - Department of Public Works. The County proposes to replace the existing timber structure (Bridge No. 14C-0083) Ackley Rd. Bridge over Manning Creek due to its poor historic hydraulic performance and deteriorated state. The existing Ackley Rd Bridge over Manning Creek consists of a single span timber stringer deck bridge measuring ~23 feet long and 25 feet wide. The bridge railing, composed of timber posts and railing, has deteriorated and is in need of replacement. The project will involve a modification or alteration of the streambed. The banks will be widened at the bridge location to allow flood flows to pass without overtopping the bridge.

Contact Information
Sandra Jacks
DFW
North Central Region 1701 Nimbus Raod
Rancho Cordova, CA 95670

916-358-2900

Location

Cities
Lakeport
Counties
Lake
Cross Streets
Ackely Road near Matthews Road
Parcel #
008-020-05, 23, 25, 50
State Highways
Hwy 175
Airports
Lampson
Waterways
Manning Creek
Township
13N
Range
9W
Section
6
Base
MDB&M

Notice of Determination

Approving Agency
DFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
County of Lake 255 N. Forbes Lakeport, CA 95453

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search