Department of Transportation (Caltrans), Coastal Developenta nd Special Permits (Big Walls)

5 Documents in Project

Summary

SCH Number
2014092019
Lead Agency
California Department of Transportation, District 3
Document Title
Department of Transportation (Caltrans), Coastal Developenta nd Special Permits (Big Walls)
Document Type
NOD - Notice of Determination
Received
Posted
11/23/2016
Present Land Use
Public Recreation
Document Description
The applicant is seeking approval of a Coastal Development Permit and Special Permit for Design Review for improvements to Hwy 101 in the Big Lagoon area at post mile (PM) 111.3 through to PM 111.7. Improvements to Hwy 101 in the Big Lagoon area at PM 111.3 through to PM 111.7. Improvements will include reconstruction of the southbound lane and shoulder and associated drainage elements. Three structures are proposed to restore and stabilize the project area: one timber lagging soldier pile ground anchor wall and two anchored pile systems. Temporary access roads will be constructed at each structure location. One-way controlled traffic with a temporary signal system will be used throughout construction. There will be two staging areas in the vicinity of Kane Road: one at PM 111.8 and another at PM 111.7. At PM 111.4 an existing 18-inch culvert and downdrain will be replaced with a new 24-inch culvert and downdrain. Any excess soils from construction will be disposed of at a commercial disposal site. Construction is expected to be approx. 290 working days over two construction seasons. Upon completion of construction the temporary access roads will be removed, regraded, and replanted with native vegetation to match adjacent conditions.

Contact Information

Name
Michelle Nielsen
Agency Name
County of Humboldt
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Cross Streets
Loc. 1 approx. two miles north and Loc. 2 approx. 2.08 miles of SR 101 and LP Mill Road
Other Location Info
Orick

Notice of Determination

Approving Agency
Humboldt County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.