Bernardo Shores (MF 1100)

2 Documents in Project

Summary

SCH Number
2014091072
Lead Agency
Imperial Beach, City of (City of Imperial Beach)
Document Title
Bernardo Shores (MF 1100)
Document Type
NOD - Notice of Determination
Received
Posted
2/17/2017
Present Land Use
C/MU-1 (General Commercial & Mixed-Use); R-3000-D (Two-Family Residential); UR

Document Description
San Diego RWQCB is issuing a Clean Water Act Section 401 water quality certification (Cert. No. R9-2016-0073) to the project applicant. The applicant proposes to construct a Class I bike path that is 1,330 linear-foot by 8 foot wide with a 1 foot shoulder on each side to connect SR 75 to the San Diego Bayshore Bikeway.

Contact Information
Nicole Gergans
RWQCB - San Diego Region
2375 Northside Dr.
San Diego, CA 92108

Phone : (619) 521-3969

Location

Coordinates
32°35'11.82"N 117°7'10.05"W
Cities
Imperial Beach
Counties
San Diego
Cross Streets
Palm Avenue & Rainbow Drive
Zip
91932
Total Acres
10.07
Parcel #
625-140-20-00 & 626-010-18-00
State Highways
Hwy 75
Railways
San Diego & Arizona
Airports
IB NOLF
Schools
Bayside & Mar Vista
Waterways
Otay River-San Diego Bay, Pacific Ocean, Tijuana River
Township
18S
Range
2W
Section
19/20
Base
SBB&M

Notice of Determination

Approving Agency
RWQCB - San Diego Region
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
1222 First Ave., San Diego, CA 92108

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print