Interim Measures - Northern and Southern Assessment Areas

4 Documents in Project

Summary

SCH Number
2014091046
Lead Agency
Toxic Substances Control, Department of (Department of Toxic Substances Control)
Document Title
Interim Measures - Northern and Southern Assessment Areas
Document Type
NOD - Notice of Determination
Received
Posted
11/7/2014
Present Land Use
Residential

Document Description
The Department of Toxic Substances Control (DTSC or Department), pursuant the authority granted under Chapter 6.5 of the Health and Safety Code has approved the a final Interim Measure Work Plan (IMWP) for the purpose of mitigating potential health risks from lead impacted soils in off-site residential properties located in the Northern Assessment Area and the Southern Assessment Areas. The Northern Assessment Area encompasses portions of the unincorporated communities of Boyle Heights and East Los Angeles, and the Southern Assessment Area is located within the city of Maywood (collectively referred to as Assessment Areas). There are a total of 215 homes in the Assessment Areas, 91 homes in the Northern Assessment Area and 124 in the Southern Assessment Area.

Contact Information
Peter Ruttlan
Department of Toxic Substances Control
8800 Cal Center Drive
Sacramento, CA 95826-3000

Phone : (916) 255-3630

Location

Coordinates
34°0'12.27"N 118°11'30.6"W
Cities
Los Angeles Maywood Maywood, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Northern: Olympic Blvd & Indiana St. Southern: 52nd St. & Everett
Total Acres
13
Parcel #
Various
State Highways
I-5, 710, Hwy 60
Railways
BNSF
Airports
No
Schools
Robert Lewis Stevenson
Waterways
Los Angeles River
Township
3S
Range
12W
Base
SBB&M

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
DTSC Office of Permitting, 8800 Cal Center Drive, Sacramento, CA 95826

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search