P14-0001: GPA 14-001, R 14-001, SP 14-001, MFSDP 14-001, TSM 14-001, CUP 14-016, ND 14-007 "Mission 316"

2 Documents in Project

Summary

SCH Number
2014091041
Lead Agency
San Marcos, City of (City of San Marcos)
Document Title
P14-0001: GPA 14-001, R 14-001, SP 14-001, MFSDP 14-001, TSM 14-001, CUP 14-016, ND 14-007 "Mission 316"
Document Type
NOD - Notice of Determination
Received
Posted
1/20/2015
Present Land Use
Heart of the City Specific Plan

Document Description
A General Plan Amendment, Rezone, Specific Plan, Multi-Family Site Development Plan, Tentative Subdivision Map and Conditional Use Permit (for a rock crusher during the grading operation). The Mission 316 Specific Plan proposes an attached multi-family, residential condominium project up to 93 units on 8.98 acres. Units range from 2-3 story, 1,400-1,990 s.f. with two-car garages. Includes common & landscaped open space, BBQ's picnic tables, tot lot & trails. Change from Commercial to Low Medium Density Residential (LMDR) in the Heart of the City SP within the Richland neighborhood. The proposal includes a request to adopt Mitigated Negative Declaration ND 14-007 (the environmental review document).

Contact Information
Planning Division
City of San Marcos
1 Civic Center Drive
San Marcos, CA 92069-2918

Phone : (760) 744-1050 x3233

Location

Coordinates
33°8'32.5"N 117°9'27.5"W
Cities
San Marcos
Counties
San Diego
Cross Streets
Mission Drive/Falcon Place
Zip
92069
Total Acres
9.27
Parcel #
220-210-10, -41, -46
State Highways
SR-78
Railways
BNSF
Waterways
San Marcos Creek

Notice of Determination

Approving Agency
City of San Marcos
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
1 Civic Center Drive, San Marcos, CA 92069

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search