P14-0001: GPA 14-001, R 14-001, SP 14-001, MFSDP 14-001, TSM 14-001, CUP 14-016, ND 14-007 "Mission 316"

2 Documents in Project

Summary

SCH Number
2014091041
Lead Agency
City of San Marcos
Document Title
P14-0001: GPA 14-001, R 14-001, SP 14-001, MFSDP 14-001, TSM 14-001, CUP 14-016, ND 14-007 "Mission 316"
Document Type
NOD - Notice of Determination
Received
Posted
1/20/2015
Present Land Use
Heart of the City Specific Plan
Document Description
A General Plan Amendment, Rezone, Specific Plan, Multi-Family Site Development Plan, Tentative Subdivision Map and Conditional Use Permit (for a rock crusher during the grading operation). The Mission 316 Specific Plan proposes an attached multi-family, residential condominium project up to 93 units on 8.98 acres. Units range from 2-3 story, 1,400-1,990 s.f. with two-car garages. Includes common & landscaped open space, BBQ's picnic tables, tot lot & trails. Change from Commercial to Low Medium Density Residential (LMDR) in the Heart of the City SP within the Richland neighborhood. The proposal includes a request to adopt Mitigated Negative Declaration ND 14-007 (the environmental review document).

Contact Information

Name
Planning Division
Agency Name
City of San Marcos
Contact Types
Lead/Public Agency

Location

Cities
San Marcos
Counties
San Diego
Cross Streets
Mission Drive/Falcon Place
Zip
92069
Total Acres
9.27
Parcel #
220-210-10, -41, -46
State Highways
SR-78
Railways
BNSF
Waterways
San Marcos Creek

Notice of Determination

Approving Agency
City of San Marcos
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print