Parkside at Baker Ranch Residential Project -Lexington at Parkside Model Home Complex- Site Development Permit 4-16-4907

10 Documents in Project

Summary

SCH Number
2014091021
Lead Agency
Lake Forest, City of (City of Lake Forest)
Document Title
Parkside at Baker Ranch Residential Project -Lexington at Parkside Model Home Complex- Site Development Permit 4-16-4907
Document Type
NOD - Notice of Determination
Received
Posted
6/13/2016
Present Land Use
Commercial with a Mineral Resources Overlay/Urban Activity with a Sand and Gravel Overlay Zone

Document Description
Site Development Permit 4-16-4907 is a request to permit construction of a model home complex for the Lexington at Parkside" residential development. The project includes three model homes, a sales office, a parking lot, fencing, landscaping and accessory structures. Site Development Permit 4-16-4907 was evaluated in and contemplated by the MND that was prepared for the Parkside at Baker Ranch Residential Project (SCH#2014091021) and approved by the City of Lake Forest City council on May 5, 2015 and was not challenged. The proposed Site Development Permit is consistent with the scope of the approved Tentative Tract Map 17707. Therefore the approved MND serves as teh environmental documentation for the project and the project is in compiance witht he requirements for CEQA.

Contact Information
Jennifer Mansur
City of Lake Forest
25550 Commercentre Drive Suite 100
Lake Forest, CA 92630

Phone : (949) 461-3472

Location

Coordinates
33°40'2.36"N 117°39'15.84"W
Cities
Lake Forest
Counties
Orange
Cross Streets
Portola Parkway and Rancho Parkway
Zip
92630
Total Acres
30
Parcel #
04-143-46, -47, -48
State Highways
Hwy 241
Schools
Heritage Montessori
Waterways
Glass Creek, Serrano Creek, Aliso Creek

Notice of Determination

Approving Agency
City of Lake Forest
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
25550 Commercentre Drive, Suite 100, Lake Forest, CA 92630

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print