U.S. 395 Sheepranch Shoulder Widening Project (Streambed Alteration Agreement No. 1600-2016-0228-R6)
4 Documents in Project
Summary
SCH Number
2014082075
Lead Agency
California Department of Transportation, District 6
Document Title
U.S. 395 Sheepranch Shoulder Widening Project (Streambed Alteration Agreement No. 1600-2016-0228-R6)
Document Type
NOD - Notice of Determination
Received
Posted
4/7/2017
Present Land Use
Recreation, Agricultural, Cattle and Sheep Ranching, Resource Management
Document Description
CDFW is executing Streambed Alteration Agreement No. 1600-2016-0228-R6, pursuant to section 1602 of the Fish and Game Code to the Permittee, the Caltrans District 9, represented by Ms. Angela Calloway.
The Stock Drive Realignment Project includes the expansion of shoulder from two feet to eight feet along 3.5 miles of hwy. The Streambed Alteration Agreement is being issued to address permanent impacts to 0.16 acres and temporary impacts to 0.04 acres of vegetated and unvegetated CDFW jurisdictional streambed (project). The project includes: the removal 57 willows; construction two retaining wall along the west bank of Swauger Creek; the extension of four culverts; and the installation of a new 24-inch by 55-foot long culvert. Surface flows will not be encountered during project activities, and equipment maintenance will be located on graded, upland locations.
Contact Information
Name
Heidi Calvert
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Counties
Mono
Cross Streets
US Hwy 395 / Buckeye Road
State Highways
US 395
Waterways
Swauger Creek
Other Location Info
Bridgeport
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No