Senador Mine Restoration Project: Phase 2

3 Documents in Project

Summary

SCH Number
2014082073
Lead Agency
Santa Clara County
Document Title
Senador Mine Restoration Project: Phase 2
Document Type
NOD - Notice of Determination
Received
Posted
10/23/2014
Present Land Use
Regional park - Almaden Quicksilver County Park
Document Description
The project would remove historic mercury mine waste; including mercury enriched soil and calcine remnant materials. The project would also include construction of erosion control measures within the Senador Mine watershed to reduce soil erosion and sediment transport into McAbee Creek from soils with elevated mercury concentrations. Project activities would include channel headcut repair, grading to create stable banks, removal of soil and replacement with clean soil, re-grading to form gentler slopes, re-vegetation and hydroseeding of the disturbed area. Additional information about the project including a more detailed project description can be found in the Initial Study and proposed Mitigated Negative Declaration.

Contact Information

Name
Reem Assaf
Agency Name
Santa Clara County Parks and Rec. Dept.
Contact Types
Lead/Public Agency

Location

Cities
San Jose
Counties
Santa Clara
Cross Streets
project within County Park along Senador Mine Trail
Zip
95196
Total Acres
2.28
Parcel #
575-10-005
State Highways
No
Railways
No
Airports
No
Waterways
McAbee Creek
Township
8S
Range
1E
Section
29
Other Location Info
New Almaden

Notice of Determination

Approving Agency
Santa Clara County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.