Canyon Estate Vesting Tentative Subdivision Map Amendment Regarding Trails

4 Documents in Project

Summary

SCH Number
2014082050
Lead Agency
City of American Canyon
Document Title
Canyon Estate Vesting Tentative Subdivision Map Amendment Regarding Trails
Document Type
NOD - Notice of Determination
Received
Posted
5/2/2016
Present Land Use
Presently designated for Agriculture, Watershed and Open Space (AW), zoned Agricultural Watershed, Special Study Area
Document Description
A tentative Subdivision Map to establish 35 single-family lots within the western 38 acres of a site adjacent to Newell Drive. The Tentative Subdivision Map shows the lot configuration, roadway configuration and the general layout of utilities. Individual residential homes would be constructed in 1-story and 2-stroy structures not exceeding 35 feet tall. The project includes 28 lots between 20,000 sq. ft. and 30,000 sq. ft., two lots between 30,000 sf and 40,000 sf and five lots measuring 40,000 sf to 45,000 sf which represent "signature lots" within this development.

Contact Information

Name
Colette Meunier
Agency Name
City of American Canyon
Contact Types
Lead/Public Agency

Location

Cities
American Canyon
Counties
Napa
Cross Streets
I-80 via American Canyon Road, SR 37 via Fairgrounds Drive and Flodson Road, and SR 29
Zip
94503
Total Acres
111.89
Parcel #
059-040-0790
State Highways
I-80, SR 37, SR 29
Railways
UPRR
Airports
Napa County
Schools
American Canyon HS
Waterways
Newell Creek

Notice of Determination

Approving Agency
City of American Canyon
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print