Butte Slough Outfall Gates Rehabilitation Project
6 Documents in Project
Summary
SCH Number
2014082018
Lead Agency
California Department of Water Resources
(DWR)
Document Title
Butte Slough Outfall Gates Rehabilitation Project
Document Type
NOD - Notice of Determination
Received
Posted
12/31/2014
Present Land Use
Agricultural
Document Description
DWR Flood Maintenance Office (FMO) proposes to restore and modernize the Butte Slough Outfall Gates (BSOG). This structure was built in 1935 and is important to the flood control system as it enables flood and agricultural water runoff regulation and equilibrium. Project activities include rehabilitation of the structure and outfall gates; establishing an on-site control facility and backup power sources; and implementation of structural and operation measures that will reduce long-term environmental impacts. These modification will extend the functional life of the structure and provide safer and more reliable outfall gate operations.
Contact Information
Name
Jon Ericson
Agency Name
California Department of Water Resources
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Colusa
Counties
Colusa, Sutter
Cross Streets
Butte Slough Road and Marty Road
Zip
95932
Total Acres
8
Parcel #
11913-A
Waterways
Sacramento River and Butte Slough
Township
16N
Range
1W
Section
35
Base
MDB&M
Notice of Determination
Approving Agency
DWR
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.