Los Angeles Regional Interoperable Communications System (LA-RICS) Land Mobile Radio (LMR) Project

5 Documents in Project

Summary

SCH Number
2014081085
Lead Agency
Joint Powers Authority
Document Title
Los Angeles Regional Interoperable Communications System (LA-RICS) Land Mobile Radio (LMR) Project
Document Type
NOD - Notice of Determination
Received
Posted
11/7/2016
Present Land Use
varies; multiple sites in multiple jurisdictions
Document Description
LMR System Design updates at Sites MMC, RIH, and SPN (listed on Attachment 1) to reflect updated LMR System Design based on ongoing design work. The LMR System consists of installation of antennas on existing and new monopoles and lattice towers and supporting radio equipment in existing and new shelters at sites primarily within the County of Los Angeles, Design updates include, but are not limited to, changes in the type of antenna support structure, shelter, generator, battery, etc. Further, the redesign has necessitated changes in the equipment counts and configuration (e.g., antennas, bay stations, equipment racks, and other auxiliary communications equipment) at particular sites to align with the new design.

Contact Information

Name
Susy Orellana Curtis
Agency Name
Los Angeles RICS Joint Powers Authority
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles
Regions
Countywide
Other Location Info
Sierra Pelona West Mountain Way, Palmdale, CA 91390 Near Workman Mill Rd., CA 90601 24574 W. Saddle Peak Road., CA 90265

Notice of Determination

Approving Agency
LA-RICS JPA
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print