Mayflower Park Boat Launch Improvement Project

2 Documents in Project

Summary

SCH Number
2014081074
Lead Agency
Riverside County Regional Park and Open Space District
Document Title
Mayflower Park Boat Launch Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
8/28/2015
Present Land Use
Agricultural (AG) / Rural Residential (R-R)

Document Description
The proposal is to extend the existing boat ramp for pile guided boarding floats and aid in erosion at the bottom of the ramp. The extension of the ramp is approximately 30 feet long by 44 feet wide. Also included in the project is to construct four piles for five sections of eight foot wide by 20 foot long pre-manufactured boarding floats on the north side of the boat launch and installation of a drainage and filter (to collect and filter surface run-off at the top of the ramp to prevent run-off from parking areas from entering into the river), remove three median islands (with light poles) in the existing parking lot for added parking spaces, and add an accessible parking stalls and accessible path of travel from the parking lot for a full accessible pedestrian path of travel.

Contact Information
H. P. Kang
Riverside County Regional Park and Open Space District
4600 Crestmore Road
Riverside, CA 92509

Phone : (951) 955-6998

Location

Coordinates
33°6.71'3.15"N 144°5.33'7.64"W
Cities
Blythe
Counties
Riverside
Cross Streets
Colorado River Road
Zip
92225
Total Acres
14.2
Parcel #
833-070-003, -004
State Highways
Hwy 95
Airports
No
Schools
No
Waterways
Colorado River
Township
6S
Range
23E
Section
12

Notice of Determination

Approving Agency
Riverside County Regional Park & Open Space District
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
4600 Crestmore Road, Riverside, CA 92509

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search