Etiwanda Pipeline North Liner Repair Project

3 Documents in Project

Summary

SCH Number
2014081047
Lead Agency
Metropolitan Water District of Southern California
Document Title
Etiwanda Pipeline North Liner Repair Project
Document Type
EIR - Draft EIR
Received
Present Land Use
Various - industrial, residential
Document Description
The proposed project involves relining approximately 4.8 miles of Etiwanda Pipeline North, including 0.4 mile in Rancho Cucamonga and 4.4 miles in Fontana. Inspections have revealed that portions of the internal lining have cracked and delaminated from the pipe due primarily to the cycling of high pressure flows within the pipeline as a result of the operation of the Etiwanda Hydroelectric Plant. To prevent further corrosion of the steel pipe in the 4.8-mile segment of Etiwanda Pipeline North, Metropolitan proposes to remove the existing interior mortar lining and recoat the pipe with a new lining.

Contact Information

Name
Wendy Picht
Agency Name
Metropolitan Water District of Southern California
Contact Types
Lead/Public Agency

Location

Cities
Fontana, Rancho Cucamonga
Counties
San Bernardino
Cross Streets
Etiwanda Ave. x Foothill Blvd to Duncan Cyn Rd x Citrus Ave
Zip
91739
State Highways
Hwy 210
Schools
Various
Township
1N
Range
6W
Section
34
Base
SBB&M

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Parks and Recreation, California Department of Transportation, District 8 (DOT), California Energy Commission, California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), California State Lands Commission (SLC), Department of Toxic Substances Control, Department of Water Resources, Resources Agency, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance, Department of Fish and Wildlife, Region 6
State Reviewing Agency Comments
Department of Fish and Wildlife, Region 6
Development Types
Other (Pipeline relining project)
Local Actions
Pipeline relining
Project Issues
Air Quality, Biological Resources, Noise, Transportation, Vegetation, GHGE

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print