Balboa Marina West

6 Documents in Project

Summary

SCH Number
2014081044
Lead Agency
City of Newport Beach
Document Title
Balboa Marina West
Document Type
NOD - Notice of Determination
Received
Posted
12/2/2014
Present Land Use
Balboa Marina/Commercial Recreation and Marine / Recreational and Marine Commercial
Document Description
Negative Declaration 2013 002 analyzes a proposal by the Project Applicants to reconfigure the arrangement of uses on the Project site to establish a new public boat dock in an area of Newport Harbor, which currently lacks a public dock, and to improve the private Balboa Marina including its water-side and land-side areas. The new public boat dock would include a gangway and approximately 12 public boat slips including eight (8) new boat slips and four (4) boat slips that would be relocated to the public dock from the existing private Balboa Marina. In the private Balboa Marina, 24 private boat slips accommodating a range of vessel sizes and a new gangway are proposed to be added. The existing bulkhead will be relocated landward approximately 15 feet, and a new cap will be installed.

Contact Information

Name
Patrick J. Alford
Agency Name
City of Newport Beach
Contact Types
Lead/Public Agency

Location

Cities
Newport Beach
Counties
Orange
Cross Streets
East Coast Highway / Bayside Drive
Zip
92660
Total Acres
4.4
State Highways
East Coast Highway
Schools
Harace Ensign Interim
Waterways
Upper and Lower Newport Bay, Pacific Ocean
Township
6S
Range
10W
Section
27
Base
SBB&M

Notice of Determination

Approving Agency
Harbor Resources Department
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No