East Downtown Stormwater Management and Retention Basins Project

3 Documents in Project

Summary

SCH Number
2014081043
Lead Agency
City of Visalia
Document Title
East Downtown Stormwater Management and Retention Basins Project
Document Type
NOD - Notice of Determination
Received
Posted
10/7/2014
Present Land Use
water courses and detention basin / Service Commercial / Service Commercial
Document Description
Proposed stormwater infrastructure project. Components include the design and construction of: two stormwater detention basins; an upgraded pump station with 1,050 linear feet of force main line to discharge from one basin to the other; a concrete weir overflow into Mill Creek, two pipeline connections into Jennings Ditch, 5,900 linear feet of gravity storm drain pipe that includes an open trench crossing of Mill Creek and 75 linear feet of steel casing borod beneath railroad tracks. The two main areas proposed for ground disturbing activity are numerated below: 1-The Jennings Ditch Detention Basin (Jennings Basin) will be adjacent to and connected with two pipelines to Jennings Ditch with an overflow weir to Mill Creek, approximately 90 feet to the south. The basin will be 2.9 acre stormwater layoff basin consisting of one cell. The basin will be excavated six feet in depth and have two feet of freeboard for a volume of 5.8 acre-feet at a water depth of four feet. The basin perimeter will be close to natural grade to blend into the natural grades for Jennings Ditch. 2-Expansion of the existing Soroptimist Basin is an expansion of the 2.1-acre, 20 feet deep retention basin by 1.8 acres and an increase of storage capacity by approximately 25 acre feet. The basin will be converted to a detention basin function with a connecting pipeline to an upgraded pump station at Goshen Avenue and Burke Street. The pump station will include 1,050 feet of force main discharge line to Jennings Ditch. The expanded basin will receive additional urban stormwater runoff through a new inflow pipeline connection from the south. The basin will receive stormwater runoff from the Downtown area, thus reducing direct stormwater discharge into Mill Creek.

Contact Information

Name
Paul Scheibel
Agency Name
City of Visalia
Contact Types
Lead/Public Agency

Location

Cities
Visalia
Counties
Tulare
Cross Streets
Santa Fe, Main Street
Zip
93291
Total Acres
20
Parcel #
various
State Highways
Hwy 63, 198, 216
Railways
SUVRR
Schools
4 ES, 3 HS, 3 MS
Waterways
Mill Creek, Jennings Ditch, St. Johns River, Packwood
Township
18
Range
25E
Section
29

Notice of Determination

Approving Agency
City of Visalia City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.