East Campus Parking Structure 2

2 Documents in Project

Summary

SCH Number
2014081042
Lead Agency
University of California San Diego
Document Title
East Campus Parking Structure 2
Document Type
NOD - Notice of Determination
Received
Posted
10/20/2014
Present Land Use
The East Campus project site are designated for medical use per UCSD's Long Range Development Plan
Document Description
The East Campus Parking Structure 2 is located at UCSD's East Campus Medical Center in the East Campus Health Sciences (ECHS) neighborhood. The project involves construction of a 446,000 gross square-foot (GSF) parking structure and a thermal energy storage (TES) tank where a surface parking lot currently exists. The project would involves demolition of the existing parking lot, minimal grading of slopes and clearing of existing ornamental vegetation, and construction of a multi-level parking structure. The parking structure would include a minimum of 1,200 parking spaces to primarily serve patient and visitor needs, while also providing some staff parking. The parking structure would include two vehicle access points, two elevators and staircases, parking control booths and ADA-accessible spaces, one unisex ADA-accessible staff restroom, custodial closets, one administrative office, and a network hub room. The project would also include installation of a bicycle storage cage, vehicle charging stations, and sustainable landscaping.

Contact Information

Name
Catherine Presmyk
Agency Name
University of California Campus Planning: Physical Planning
Contact Types
Lead/Public Agency

Location

Cities
La Jolla
Counties
San Diego
Cross Streets
Health Sciences Drive and Medical Center Drive
Zip
92093
Total Acres
3
State Highways
I-5, 805
Railways
NCTD Coaster, Amtrak
Schools
La Jolla Country Day
Waterways
Rose Creek
Township
15S
Range
4W

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.