Sycamore-Penasquitos 230 Kilavolt Transmission Line Project

4 Documents in Project

Summary

SCH Number
2014081031
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
Sycamore-Penasquitos 230 Kilavolt Transmission Line Project
Document Type
NOD - Notice of Determination
Received
Posted
10/21/2016
Present Land Use
SDG&E right of way and City of San Diego road right-of-way
Document Description
San Diego Gas & Electric proposes to construct and operate an approximately 16.7-mile long 230 Kilavolt transmission line between the Sycamore Canyon and Penasquitos Substations. The transmission line would be located within the Cities of Poway and San Diego and a short segment is located on Marine Corps Air Station Miramar. The proposed power line would include approximately 13.9 miles of overhead line on new tubular steel poles and existing steel towers and 2.8 miles of underground line within Carmel Valley Road.

Contact Information

Name
Billie Blanchard
Agency Name
California Public Utilities Commission
Contact Types
Lead/Public Agency

Location

Cities
Poway, San Diego
Counties
San Diego
Zip
92129
Total Acres
217.9
State Highways
I-15 and SR-56
Railways
Pacific Surfliner
Schools
Mt. Carmel High
Waterways
Pacific Ocean and Penasquitos Creek

Notice of Determination

Approving Agency
CA Public Utitlities Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes