Critchfield

2 Documents in Project

Summary

SCH Number
2014081027
Lead Agency
Monterey County
Document Title
Critchfield
Document Type
NOD - Notice of Determination
Received
Posted
6/17/2015
Present Land Use
LDR/1.5-D (CZ), Residential

Document Description
Combined Development Permit consisting of: 1) a Coastal Administrative Permit for the construction of a 5,745 sf two-story single family dwelling with an attached 855 sf garage, a 111 sf entry kiosk, a 101 sf covered mechanical/trash enclosure, a total of 1,814 sf of covered patios, and an enclosed courtyard containing a swimming pool, spa, BBQ and fire pit; and grading (1,221 cubic yards of cut/823 cubic yards of fill); 2) a Coastal Administrative Permit for the construction of an 1,172 sf second dwelling unit with an 86 sf covered patio; 3) a Coastal Development Permit for the removal of 96 trees [18 dead trees, 16 protected Oak trees and 62 Pine trees (42 of which are less than 12" in diameter)]; and 4) Design Approval. The property is located at 1264 Sombria Lane, Pebble Beach (Assessor's Parcel Number 008-301-006-000), Del Monte Forest Land Use Plan, Coastal Zone.

Contact Information
Ramon Montano
Monterey County
168 West Alisal Street 2nd Floor
Salinas, CA 93901

Phone : (831) 755-5169

Location

Counties
Monterey
Cross Streets
Portola Road
Zip
93953
Total Acres
2.75
Parcel #
008-301-006-000
State Highways
Hwy 1
Schools
Robert Louis Steve
Waterways
Pacific Ocean
Other Location Info
Pebble Beach

Notice of Determination

Approving Agency
County of Monterey
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
County of Monterey, 168 West Alisal, 2nd Floor, Salinas, CA 93901

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search