Surface Mining Permit and Reclamation Plan No. PMR 14-002

3 Documents in Project

Summary

SCH Number
2014081023
Lead Agency
Tulare County
Document Title
Surface Mining Permit and Reclamation Plan No. PMR 14-002
Document Type
NOD - Notice of Determination
Received
Posted
3/17/2015
Present Land Use
Various
Document Description
Final Environmental Impact Report, Mitigation Monitoring and Reporting Program, and Surface Mining Permit and Reclamation Plan, to amend an existing 98 acre surface mining operation to increase annual production from 500,000, to a maximum 950,000 tons per year, as permitted by PMR 01-001, PMR 09-002, and PSP 01-055 (ZA). The requested permit amendments will make PMR 01-001, PMR 09-002, and PSP 01-055 (ZA) consistent, and allow for heavy-duty truck hauling not to exceed 376 round-trips per day, with no lateral expansion of the existing approved mine footprint. The estimated total production is still 40,000,000 tons of rock material over an estimated 50-years of operation. The disturbed area is proposed to be reclaimed for grazing. The mined material will be transported by truck to the Deer Creek Rock Company site, an existing permitted rock plant adjacent to the Project site. Result in no increase in the maximum depth of the mine as expansion will occur laterally.

Contact Information

Name
Hector Guerra
Agency Name
Tulare County
Contact Types
Lead/Public Agency

Location

Cities
Porterville
Counties
Tulare
Cross Streets
1/3 mile east of Avenue 120 and Road 272, Porterville, CA.
Zip
93647
Total Acres
118
Parcel #
305-190-018, 305-190-020
State Highways
No
Railways
No
Airports
No
Schools
No
Waterways
Deer Creek
Township
22S
Range
28E
Section
21
Base
MDB&M

Notice of Determination

Approving Agency
Tulare County Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.